It can be inferred that the charger fault is caused by the control board. Continue the AC wiring to fuseholder terminals L1 (N) and L2 (L) (single phase input) or L1, L2, and L3 (three phase input), ensuring that the AC source phases match the phase rotation on the AC input. Exide -GNB 2100 HP - high frequency charger 318 0 obj
<>stream
1. D3E2-24-850B Exide Depth Charger showing codes C=04 & E=05 with connected battery and disconnected too.. Continue the AC wiring to fuseholder terminals L1 (N) and L2 (L) (single phase input) or L1, L2, and L3 (three phase input), ensuring that the AC source phases match the phase rotation on the AC input. Home
they are displayed when no battery is connected. Have the charger examined by a GNB service representative or local qualified service facility.
8.2.2 VOLTS Release the UP or DOWN button to display the voltage per cell as: [ x.xx V]. The green ground wire in the AC input wiring must be connected to the charger ground stud (Identified by a green dot and ground symbol). Incorrect re-assembly of the charger may result in an explosion, electric shock or fire. 7.2.1 JIC SWITCH ASSEMBLY. The generator must be capable of at least four, times the input power requirements of the charger, failure to do so, can result in damage to the charger. Fuses with an ampere rating of 30A or less are smaller and need fuse reducers when placed in a 60A fuseblock. Copyright 2021Exide Technologies. - 36.5 50 31.5 16 FUSE 40 20 AMPS AMPS C.F. For proper connection, torque the screws to approximately 25 inch-pounds. C 12.75 22.25 22.25 23.65 23.65 31.50 NOTE: Mining chargers are equipped with a drip cap and four lifting eyebolts for sling lifting. A LCD display guides you through the charging operation, and high-visibility LEDs show charge status at a glance. 9.1.7 EQUALIZE STAGE 9.1.7.1 EQUALIZE PUSHBUTTON This pushbutton when pressed will extend the charge cycle by 3.5 hours in the equalize mode after the finish rate time has expired. GNB warrants that each new electric vehicle battery charger supplied by it, is of good workmanship and is free from any inherent mechanical defects, provided: 1.1The product is installed and operated in accordance with generally accepted industrial standards and in accordance with the printed instructions supplied with the charger. 1.3The charger receives proper care, protection, and maintenance under supervision of competent personnel. 7.1 FAULT AND DISPLAY CODES. NOTE: Only HRCI-R type fuses (ECSR or equivalent) with the notched ferrule at one end can be used. All SCR100 battery chargers can come with a factory installed fused JIC switch assembly option for extra protection of the operator. (Section 9.1. During year four (4) of the warranty, GNB will only cover parts, no labor or travel will be provided by GNB. TABLE 3 - THREE PHASE RATINGS 11. This warranty is extended by GNB only to the original user who purchases or leases a new charger product from GNB or one of its authorized representatives. Electric forklift battery charger troubleshooting points a)Before using the battery charger, read all the instructions in addition to the CAUTION, WARNING, and DANGER markings on the charger, battery and all the associated equipment. 1-888-563-6300 in the USA . 9.0 SCRFLX CHARGER OPERATION LED DISPLAY DESCRIPTION (NONE) OFF FLd* PLUG IN THE BATTERY TO COMMENCE CHARGING CHARGER SET FOR FLOODED BATTERIES DELAY (Orange), dEL, then delay time remaining in Hours. 10. DELAY CIRCUIT CAUTION: HAZARDOUS VOLTAGES INSIDE. Ensure that battery and charger are matched. any latin characters (a-z, A-Z) any numbers (0-9) special characters ("-", "_" and "."). When installing the push buttons ensure that there are no corrosive fumes deteriorating the contacts. USE COPPER-CLAD ALUMINUM, ALUMINUM OR COPPER CONDUCTORS ONLY. In the "ON" position, AC power is supplied to the charger but the door cannot be opened. During the last six (6) years of the ten (10) year warranty on power transformers, SCR's and silicon diodes, GNB will bear costs of parts replacement only; no labor or other services will be provided by GNB. Ambient. The charger comes with a fuseblock rated big enough to accommodate the highest possible current and voltage for that particular model. If the output voltage of the rectifier module is normal, then perform the main circuit charge detection, plug the battery plug, start charging, measure the current with the clamp current meter, if there is a certain charging current (the current value varies with the battery power), Indicates that the entire main circuit is working properly. 1. The V Series Li-ion Battery Forklift, with optimized perfomance and reliability, advanced safety features and a powerful and efficient L-ion battery system, is now in worldwide production and shipment. . Following that, check Table 3 (pages 11-12) for the correct size of AC input fuses. In the "ON" position, AC power is supplied to the charger but the door cannot be opened. Exide Technologies SCR100 User Manual - ManualMachine.com A Division of Exide Technologies SALES - SERVICE - RECYCLING TOLL FREE . Examine the charger thoroughly before using, to make sure that no parts have been loosened or damaged during shipment. According to the French ministry of foreign affairs, about 90 million international visitors visited in France in 2019, and tourism makes up 8% of the country's gross domestic product. For battery sizes not listed, contact your local GNB service representative. GNB NEITHER ASSUMES NOR AUTHORIZES ANY PERSON TO ASSUME FOR GNB ANY OTHER LIABILITY IN CONNECTION WITH THE SALE OR USE OF THE PRODUCT, AND THERE ARE NO ORAL AGREEMENTS OR WARRANTIES COLLATERAL TO OR AFFECTING THIS WRITTEN WARRANTY. The SCR100 chargers are delivered on skids for easy handling using a fork lift truck. Verify AC voltage per nameplate of the charger and electricians tag. To permit free air flow for convection cooling allow four inches minimum between the charger and any wall, six inches from other equipment, and never store anything beneath or on top of the charger. error message by depth exide charger - Forkliftaction Proper installation is important in order to achieve good charger performance and long troublefree operation and to prevent damage to the charger and batteries. FOR SUPPLY CONNECTIONS, GROUND CHARGER PROPERLY USING GROUNDING STUD (GND) PROVIDED. Click here for more information. PAGE 3. The HP range of high-frequency chargers offers optimal charging while consuming less power. minutes OFF dEL time DELAY MODE, PRESS START BUTTON TO OVERRIDE. The SCR100 battery charger can come with a factory installed Remote Stop / Equalize assembly option (partnumber V16-31365-50) in case the charger is out of reach for the operator. h)This charger is factory set to charge lead-acid batteries only. Refer to Appendix A (on page 20) for a complete list of codes. SCR100 Charger - Exide Technologies . As part of its New Energy initiative, HC Forklift America Mitsubishi Heavy Industries (MHI) has taken an ownership stake in energy specialist PolyCharge. The charger comes with a ground lug attached to the stud, clearly marked on the chassis. %%EOF
For battery sizes not listed, contact your local GNB service representative. Take it to a qualified GNB service center. Incorrect, UNC hardware provided in all four corners on top cover, markings on the door label and the unit nameplate must be revised, BATTERY WATERING OPERATION AND END OF CHARGE, Upload manuals that we do not have and get. Take it to a qualified GNB service center. Installation must only be carried out by suitably qualified personnel, and in accordance with current local and national wiring, The unit should be positioned using lifting equipment, placed under, Battery leads should not be altered without prior consultation with, The charger should be sited in a cool, dry, well-ventilated location, away from corrosive fumes and humid atmospheres. GNB shall not be obligated to reimburse the original user or any other person for any work performed. - C 410 186 47. Figure 3 (page 6) applies to 12 cell 475, 600, 750, 865 Ah; 18 cell 475, 600, 750, 865, 965, 1050 Ah; and 24 cell 475, 600, 750, 865Ah chargers only. GNBs liability is limited to the repair of the defect or, at GNBs option, the replacement of the defective parts. The front panel has STOP, =, EDIT and INFO buttons. | Sitemap
3. Australia, FMH,
United States, Peak Technologies,
They are designed to charge flooded lead-acid batteries only. The generator should have, load step immunity to prevent undershoot and overshoot with, typical loads. 3.2Primary switch contacts, fuses, bulbs, and filters are not warranted unless found to be defective prior to use. Only qualified personnel should operate or service this equipment. When stacking chargers on top of each other, ensure that cabinets are bolted together using properly sized black #1/4-20 UNC hardware provided in all four corners on top cover. Connect or disconnect the battery plug only when the charger output is off; ALWAYS press the STOP pushbutton before unplugging the battery. 7.1 DISPLAY AND FAULT CODES. 1.7 Battery Connector and Charging Cable Verify that the connectors on both the battery and the charger are attached so that the positive output terminal of the charger is connected to the positive battery Lead-acid battery safety precautions and storage instructions, Electric forklift battery repair work list, About battery forklift charging battery cover to open the problem. TABLE 2 SINGLE PHASE TECHNICAL DATA STANDARD MODEL SCRFLX-XX-XXXX-S1Z DC AC AMPS @ AC VOLTS AMPS SCRFLX-18-600S1Z 93 SCRFLX-18-750S1Z 116 SCRFLX-18-865S1Z 134 (50 Hz) 134 SCRFLX-24-260S1Z 40 SCRFLX-24-475S1Z 74 (50 Hz) 74 SCRFLX-24-600S1Z 93 (50 Hz) 93 WEIGHT 480 CABINET TYPE LBS KGS B 260 118 C 260 118 C 325 147 C 340 155 B 300 135 C 315 143 C 340 155 C 380 172 C 400 182 120 208 240 C.F. When installing the push buttons ensure that there are no corrosive fumes deteriorating the contacts. PAGE 2. A spare cable is included. %PDF-1.6
%
Subscribe Now to access
In order to permit free air flow for convection cooling allow four inches minimum between the charger and any wall, six inches from other equipment, and never store anything beneath and on top of the charger. | About Us
7.2 OPTIONS. Chargers | Exide Chargers What are Chargers? Do not expose the charger to rain or snow. j)Do not disassemble the charger. 9.2 Momentary Remote and Stop Operation . SCR100 Charger - Exide Technologies - YUMPU hmo8r#x)tr^C 4.2Replacement and exchange parts will be warranted for a period of ninety (90) days. The charger has a comprehensive self-checking diagnostic program to control all charger functions, monitor the quality of charge and check its own safety conditions. g)The charger is NOT for outdoor use. Typically the generator control bandwidth should be. Incorrect. Click here for more information. permanently connected to the mains supply. Similarly when changing input voltage between 1) 208, 240, 480 VAC or 2) 380, 415VAC (three phase input) follow the schematics on Figure 2 or Figure 3 (pages 5-6) whichever is applicable. After the voltage rises to 20V or higher, restore the links of J2 and J3 on the circuit board. Having trouble using the Discussion Forums? They are designed to charge flooded lead-acid batteries only. "Thanks to our advertising with Forkliftaction, we were able to find new distributors for our disruptive proximity warning solution". All Rights Reserved. 4.4GNB will only bear costs for freight 12 months from the initial date of shipment on any replacement or repair. The Exide 12/5.5 charger (12 V, 5.5 A) is perfect for basic needs.
Page 5: Charger Features European Parliament last week passed the new EU Machinery Regulation. CAUTION: USE MINIMUM 75C WIRING. To restart the charger, plug in the next battery. The DC charging cable has a commonly used battery plug or receptacle. Connect or disconnect the battery plug only when the charger output is off; ALWAYS press the STOP pushbutton before unplugging the battery. i)Do not operate this unit if it has received a sharp blow, been dropped or otherwise damaged. GNB and its authorized representatives shall not be liable for direct or indirect, special or consequential damages in excess of such repair or replacement. Before installing check that the charger nameplate data corresponds to the packing slip and to the model specified on the original sales order. The contract is part of Bestranes campaign to expand the A Perthshire-based company has been fined GBP27,000 (USD33,500) for health and safety failures after a worker lost part of a leg in a forklift accident. Do not operate this unit if it has received a sharp blow, been dropped or otherwise damaged. 278 0 obj
<>
endobj
4.2 Battery with wrong number of cells connected to a charger. United Kingdom. The SCRFLX chargers are delivered on skids for easy handling using a fork lift truck. WARNING: THE ABOVE PROCEDURES MUST BE FOLLOWED EXACTLY TO AVOID INJURY OR RISK OF ELECTRIC SHOCK. Tat2dPete,
The charger should be located in a clean, cool, normal ambient room temperature (between +45F/7.2C and 90F/32.2C) dry and well ventilated area. d)If the battery is unplugged during charging, the charger will indicate OFF. SPP PowrPak Series Industrial Battery Chargers. Proper fuse ratings can be found in Table 2 and Table 3(see pages 9-12) for AC input fuses (F1, F2 in case of a single phase input or F1, F2, F3 in case of a three phase input). hbbd``b`@i&`,? The charger can be re-set for anywhere between 65% to 200% of the nameplate Ah rating. The product purchased or leased under this agreement shall be used exclusively by the original user and its employees and by no other persons and, therefore, there shall be no third party beneficiary to this warranty. B 20.65 26.65 26.65 42.00 42.00 59.00 DIM. Follow Figure 1 (page 4) for single phase input or Figure 2 and Figure 3 (pages 5-6) for three phase input transformers. 9.1.2.2 80 % CHARGED LED 9.1.1 DELAY STAGE 9.1.1.1 This LED indicates that the charger is ON. Electric forklift battery charger troubleshooting points, Correct charging method for forklift battery, Common misuse of forklift battery maintenance, maintenance-free "maintenance-free". Do not expose the charger to rain or snow. Battery chargers come in many shapes and sizes designed to replace the energy consumed with the highest level of efficiency. Maintenance process
During the initial three (3) years of charger warranty period, GNB will bear all parts and labor costs of such repair or replacement. The charger is warranted for four (4) years from the date of manufacture as determined by the product serial number, with the following exceptions: 3.1Power transformers, SCR's and silicon diodes are warranted for ten (10) years from the date of manufacture of the charger(s) of which they are a part. GNB Industrial Battery Charger Installation And Operation Manual Only connect the AC mains power supply (not connected to the battery DC), use the AC voltage of the multimeter, the black test pen is connected to the position of the screw pile head, the red test pen is connected to the lower right position, and the AC voltage should be about 28V, then Connect the red test lead to the position of the upper pile head (the black test pen position is unchanged), and the AC voltage should be about 28V. Check the contents of the package against the delivery slip before disposing of the shipping package. Testing has ensured that the, battery and c harger combination conform as a system for use in, Light and Heavy Industrial environments for each respective, product variant. Continue the AC wiring to fuseholder terminals L1 (N) and L2 (L) (single phase input) or L1, L2, and L3 (three phase input), ensuring that the AC source phases match the phase rotation on the AC input. TABLE 3 THREE PHASE TECHNICAL DATA AC AMPS @ AC VOLTS STANDARD MODEL DC 60Hz SCRFLX-XX-XXXX-T1Z AMPS SCRFLX-06-475T1Z SCRFLX-06-600T1Z SCRFLX-06-750T1Z SCRFLX-06-865T1Z SCRFLX-06-965T1Z SCRFLX-06-1050T1Z 134 SCRFLX-12-475T1Z SCRFLX-12-600T1Z SCRFLX-12-750T1Z SCRFLX-12-865T1Z SCRFLX-12-965T1Z SCRFLX-12-1050T1Z SCRFLX-12-1200T1Z TYPE LBS KGS 5 7 4.5 6 2.2 3 C.F. Forkliftaction.com accepts no responsibility for forum content and requires forum participants to adhere to the rules. 0
If the battery is unplugged during charging, the charger will indicate OFF/FCA. The charger comes with a fuseblock rated big enough to accommodate the highest possible current and voltage for that particular model. The BLACK DC cable must be connected to the battery negative (-), and the RED DC cable must be connected to the battery positive (+). does it work correctly with a battery connected? Do not disassemble the charger. 7.2.2BATTERY WATERING OPERATION AND END OF CHARGE. 4.1GNBs liability is limited to the repair of the defect or, at GNBs option, the replacement of the defective parts. 2.0 INTRODUCTION The GNB SCRFLX battery chargers are convection cooled, solid state, micro-processor controlled SCR regulated chargers designed to make battery charging simple. Battery chargers restore the electrical energy used during battery operation back to a full state of charge. IMPORTANT OPERATING AND SAFETY INSTRUCTIONS, 9.1 SCR100 Charger Functional Description, APPENDIX A: SCR100 BATTERY CHARGERS LIST OF DISPLAY INDICATIONS, APPENDIX B: ELECTRICAL SCHEMATIC DRAWINGS, SCR100 SERIES INDUSTRIAL BATTERY CHARGERS, 1.0 IMPORTANT OPERATING AND SAFETY INSTRUCTIONS. TABLE OF CONTENTS TITLE PAGE 1.0 IMPORTANT OPERATING AND SAFETY INSTRUCTIONS 2 2.0 INTRODUCTION 3 3.0 RECEIVING CHARGER 3 4.0 LOCATION AND INSTALLATION OF CHARGER 3 4.1 Stacking 3 5.0 AC ELECTRICAL SUPPLY 3 5.1 AC Fuse Mounting 3 5.2 Input Voltage Change 3 5.3 AC Voltage Connections 7 5.4 Ground connection 7 6.0 DC OUTPUT 7 7.0 APPLICATION 8 7.1 Display and Fault Codes 8 7.2 Options 8 TABLE 2 - SINGLE PHASE RATINGS 9 TABLE 3 - THREE PHASE RATINGS 11 8. For an equalize charge cycle, the current value is displayed as [ xx.xx E). WARNING: TO REDUCE THE RISK OF FIRE, INSTALL BATTERY CHARGER ON A FLOOR OF NON-COMBUSTIBLE MATERIAL SUCH AS. GNB SCR200 Charger I O Manual V19CIL5200ULS | Manualzz See gounding method shown below (Figure 4.). thx welder libor Posted 22 May 2020 14:53 Discussion started by Libor_Tobolak California, United States libor tobolam Post a Reply Report this post Having trouble using the Discussion Forums? Operating Instructions and Safety Precautions for the EHF Series Charger, Only a t rained person should operate this equipment. We will report back on the show itself next week, but the most significant news for the European equipment sector has probably been overlooked in the lead-up to the show. Chargers | Exide The inspection and maintenance of the charger is very important in the daily use of the electric forklift. Given that we're at LogiMAT in Stuttgart, Germany, it's no surprise that this week's news has some European flavour. PDF 12 15 - Exide Only qualified personnel should operate or service this equipment. All SCR100 battery chargers can come with a factory installed fused JIC switch assembly option for extra protection of the operator. to endanger life, so insulated, shrouded connectors must be fitted. The relay closes thirty minutes after the charger reaches gassing voltage. For non Z models contact your local GNB service representative. Do not disassemble the charger. @Am V*pqA,g MHpMQ 2@$30R=@ S
Towards the end of charge, lead acid batteries give off hydrogen, gas, which is explosive if in sufficient concentration, therefore, avoid flames and sparks. Kalmar USA,
Before proceeding check which transformer tap configuration you have. EXCEPT AS STATED ABOVE, ALL OTHER WARRANTIES AND CONDITIONS, EITHER EXPRESS OR IMPLIED, INCLUDING IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE, ARE EXCLUDED AND ORIGINAL USER ASSUMES ALL RISK AND LIABILITY RESULTING FROM USE OF THE PRODUCT. Verify AC voltage per nameplate of the charger and electricians tag. John Brodie, 65, suffered DRIVERLESS/AUTOMATED MATERIALS HANDLING - April 2023. Once finished, refer to Table 2 (pages 9-10) for the correct size of AC input fuses. 22 May 2020 14:53. Except as authorized in writing, this warranty does not cover any equipment that has been repaired or modified by any party other than GNB. 7.2.1 JIC SWITCH ASSEMBLY. f)De-energize all AC and DC power connections before servicing this unit. When the battery voltage is lower than 20V, you can . During the initial three (3) years of charger warranty period, GNB will bear all parts and labor costs of such repair or replacement. Any claimed defect is subject to GNB's inspection and judgment, after the defective product has been returned by the original user at its expense to GNBs designated point of shipment. We will report back on the show itself next week, but the most significant news for the European equipment sector has probably been overlooked in the lead-up to the show. PDF EF SERIES Ferroresonant Industrial Charger - Exide 8.2.3 AMPHR Release the UP or DOWN button to display the cumulative amp-hours returned to the battery as: [xxxx H]. IF THIS IS NOT AVAILABLE, A FLOOR PLATE OF AT LEAST 1.43mm GALVANIZED OR 1.6mm UNCOATED STEEL EXTENDED AT LEAST 150mm BEYOND THE EQUIPMENT ON ALL SIDES MUST BE INSTALLED. STONE, BRICK, CONCRETE OR METAL. Replacement and exchange parts will be warranted for a period of ninety (90) days. ri0hG7?kuy&3kao=`#oJ^._0SSFO=hv0"4?GOGDRHD&?pI.\g\&JCn`@4[8w+3LL.2|?fi ?Of^jhRYhg`iz"{vpLL2_F8_RcY];u(itj{. Exide Battery Charger tn80dx080 1 Solutions there is no problem just want to go over setup 6a Exide Battery Charger 7001207 0 Solutions Is a wiring diagram available for Exide NPC 18-3-9 Exide Battery Charger NPC 18-3-950L 0 Solutions need manual for exide model ES3-12-850 charger Exide Battery Charger ES3-12-850 0 Solutions To connect the input AC voltage, route the AC conduit through the knockout hole provided. 8.0 CABINET OUTLINE/DIMENSIONS FOR Z MODEL CHARGERS ONLY CABINET A B C D D (Mining) E (Mining) DIM. The Remote Stop / Equalize option is available for Z model chargers B and C cabinets, 6 36 cells only. 5 Jan 2011 21:20. 1.5The charger is used exclusively by the original user and by no other persons. FIGURE 3: THREE PHASE INPUT WARNING: IMPROPER WIRE AND JUMPER CONNECTION MAY CAUSE SEVERE DAMAGE TO THE CHARGER AND BATTERY 208VAC CONFIGURATION (208/240/480V INPUT) (SCRFLX- XX-XXXXT1Z ONLY) L1 L1 L3 L2 L3 L2 240VAC CONFIGURATION (208/240/480V INPUT) (SCRFLX -XX-XXXXT1Z ONLY) L1 L2 L1 L3 L2 L3 480VAC CONFIGURATION (208/240/480V INPUT) (SCRFLX -XX-XXXXT1Z ONLY) L1 L2 L3 L2 Instr. What is the voltage of the forklift battery? Or no voltage output, you can determine that the rectifier module is faulty. 2100 HP. Options . SCRFLX SERIES INDUSTRIAL BATTERY CHARGERS 1.0 IMPORTANT OPERATING AND SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS a) Before using the battery charger, read all the instructions in addition to the CAUTION, WARNING, and DANGER markings on the charger, battery and all the associated equipment. The polarity of the charger plug must be the same as the battery connector. any ideas Posted 5 Jan 2011 09:59 Discussion started by dan_selph California, United States Post a Reply Report this post Showing items 1 - 1 of 1 results. The DC output fuse is a "fast-acting" fuse used to protect the power semiconductors of a charger. Take it to a qualified GNB service center. The end user will have to install two separate push buttons to the appropriate terminals on the Remote Stop / Equalize circuit board (see schematic 4120-66-68650-50) and locate them to a. convenient location for use. (Note: When the main circuit is charging, the circuit board is completely disconnected, the charging process is not controlled, it can only be counted as time charging test, and can not be charged for a long time). Operating environment should not contain any contaminations that may cause corrosion or contamination that would degrade the performance of a charger. THE CHARGER PROPERLY USING THE THREADED M6 HOLE (GND) PROVIDED. Large easy to read LEDs, three button keypad and LED display report on charger and battery status. If the voltage is not under voltage, please open the charger casing in case of power failure, and observe whether the fuse, transformer, circuit board and other components are obviously burnt or damaged. Step 4: Check the battery charging current
The charger will not operate in a reversed polarity condition. The charger should be. 7.2 OPTIONS. Australias Bestrane has secured a contract with British grocery delivery company Ocado, one of the worlds largest online grocers. Keep in mind if the charger is set for more than 100% of Ah of the charger rating the charging time will increase proportionately (up to 16 hours). If any shipping damage or partial loss is found, file a claim with the carrier without delay and take any necessary steps to protect your rights. more great content like this. NOTE:These options require different control cards per drawing 4120-65-68650-05 (see Appendix B, pages 2131). PAGE 1. FIGURE 1: SINGLE PHASE INPUT WARNING: IMPROPER WIRE AND JUMPER CONNECTION MAY CAUSE SEVERE DAMAGE TO THE CHARGER AND BATTERY 120 VAC CONFIGURATION (120/208/240V INPUT) BRN BLK L2 208 VAC CONFIGURATION (208/240/480V INPUT) BRN BLK L2 L1 208 VAC CONFIGURATION (120/208/240V INPUT) BLK L1 240 VAC CONFIGURATION (208/240/480V INPUT) BRN BLK BRN L2 L1 L1 L2 240 VAC CONFIGURATION (120/208/240V INPUT) 480 VAC CONFIGURATION (208/240/480V INPUT) BLK BLK BRN BRN L2 Instr. Exide Battery Charger Product Support | ManualsOnline.com It will then enter into force 20 days later and start applying after 42 months - allowing plenty of time for the industry to implement the changes and for standardisers to produce or update the necessary harmonised standards. Follow Figure 1 (page 4) for single phase input or Figure 2 and Figure 3 (pages 5-6) for three phase input transformers. 1.4The charger is used within the published performance rating for the unit involved. The charger should be permanently connected to the mains supply.
APPENDIX B: ELECTRICAL SCHEMATIC DRAWINGS Pages 21-31 Instr. To connect the input AC voltage, route the AC conduit through the knockout hole provided. b)Do not touch uninsulated parts of the DC output connector or the battery terminals, as there is a possibility of electric shock. Final details will not be available until the legislation is published in the EU Official Journal in July. d)If the battery is unplugged during charging, the charger will indicate OFF/FCA. It is a requirement to ground the chassis while the charger is connected to AC power. - C.F. See gounding method shown below (Figure 4.). SPP PowrPak Series Industrial Battery Chargers. The charger is NOT for outdoor use. The input, and output voltages used with this equipment may be high enough. GNB shall not be obligated to reimburse the original user or any other person for any work performed.
Westcott Navy Vs Hale Navy,
What Is The Importance Of Social Organization,
Cast To Void *' From Smaller Integer Type 'int,
Rock Candy Sherwin Williams Undertones,
Articles E